PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing North (800x600).jpg Installing the Shear wall panels at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg 023 (800x600).jpg 024 (800x600).jpg Backfill inside the radius at the Monumental Stairs Facing East (800x600).jpg Bolting Derrick -2 Facing North (800x600).jpg Bolting Derrick -2 Facing West (800x600).jpg Compacting 2 lift along foundation walls at column line 1 from G.1-E.3 Facing North-East(800x600).jpg Compacting aroung Monumental Stair radius Facing North-West (800x600).jpg
Previous pageNext page Backfill inside the radius at the Monumental Stairs Facing East (800x600)
Backfill inside the radius at the Monumental Stairs Facing East (800x600)